N2 - In Japan, technical standard for asphalt facing-typed dam or reservoir is not established. So, a unique method of stability evaluation for a reservoir fully surfaced with asphalt mixture has been proposed for upper reservoir of Omarugawa pumped-storage power plant in Japan. The asphalt facing work is now under execution, and it is aimed to complete in February 2006. A construction work control standard for asphalt facing of this site has been established on the assumption of a-year-round construction in consideration of the results of laboratory tests and trial construction. Besides, some brand-new control methods have been established at this site including standardization of temperature of the last compaction work and execution of indirect leveling for the purpose of verifying the result of general layer thickness control method based on measurement of total weight of paved asphalt mixture. In this paper, the basic concept on the design of a reservoir fully surfaced with asphalt concrete is interpreted first. Secondary, a state-of-the-art construction work control standard for the asphalt facing established for this site is described.
AB - In Japan, technical standard for asphalt facing-typed dam or reservoir is not established. So, a unique method of stability evaluation for a reservoir fully surfaced with asphalt mixture has been proposed for upper reservoir of Omarugawa pumped-storage power plant in Japan. The asphalt facing work is now under execution, and it is aimed to complete in February 2006. A construction work control standard for asphalt facing of this site has been established on the assumption of a-year-round construction in consideration of the results of laboratory tests and trial construction. Besides, some brand-new control methods have been established at this site including standardization of temperature of the last compaction work and execution of indirect leveling for the purpose of verifying the result of general layer thickness control method based on measurement of total weight of paved asphalt mixture. In this paper, the basic concept on the design of a reservoir fully surfaced with asphalt concrete is interpreted first. Secondary, a state-of-the-art construction work control standard for the asphalt facing established for this site is described.
UR - http://www.scopus.com/inward/record.url?scp=15344339729&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=15344339729&partnerID=8YFLogxK
U2 - 10.1201/9780203020678.ch92
DO - 10.1201/9780203020678.ch92
M3 - Conference contribution
AN - SCOPUS:15344339729
SN - 0415362407
SN - 9780415362405
T3 - Proceedings of the 4th International Conference on Dam Engineering - New Developments in Dam Engineering
SP - 777
EP - 786
BT - Proceedings of the 4th International Conference on Dam Engineering - New Developments in Dam Engineering
PB - shers
T2 - Proceedings of the 4th International Conference on Dam Engineering - New Developments in Dam Engineering
Y2 - 18 October 2004 through 20 October 2004
ER -