Abstract
ILC detectors are required to have unprecedented precision. Achieving this requires significant investment for test beam activities to complete the detector R&D needed, to test prototypes and (later) to qualify final detector system designs, including integrated system test. This document summarizes the discussion at this workshop on the test beam facilities and detector R&D programs to be performed there.
Original language | English |
---|---|
Publication status | Published - 2010 |
Externally published | Yes |
Event | 2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010 - Beijing, China Duration: Mar 26 2010 → Mar 30 2010 |
Other
Other | 2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010 |
---|---|
Country/Territory | China |
City | Beijing |
Period | 3/26/10 → 3/30/10 |
All Science Journal Classification (ASJC) codes
- Nuclear and High Energy Physics