Test beams summary

Research output: Contribution to conferencePaperpeer-review

Abstract

ILC detectors are required to have unprecedented precision. Achieving this requires significant investment for test beam activities to complete the detector R&D needed, to test prototypes and (later) to qualify final detector system designs, including integrated system test. This document summarizes the discussion at this workshop on the test beam facilities and detector R&D programs to be performed there.

Original languageEnglish
Publication statusPublished - 2010
Externally publishedYes
Event2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010 - Beijing, China
Duration: Mar 26 2010Mar 30 2010

Other

Other2010 Linear Collider Workshop, LCWS 2010 and International Linear Collider Meeting, ILC 2010
Country/TerritoryChina
CityBeijing
Period3/26/103/30/10

All Science Journal Classification (ASJC) codes

  • Nuclear and High Energy Physics

Fingerprint

Dive into the research topics of 'Test beams summary'. Together they form a unique fingerprint.

Cite this